Adatech | INDIRECT WBH HEAT TRACING FOR SUMED NATURAL GAS PRESSURE REDUCING & METERING STATION

    Continuously
    Perfect Engineering
    (+90) 216 392 14 61
    Clarification Text I've read it. I accept it.
    Adatech | INDIRECT WBH HEAT TRACING FOR SUMED NATURAL GAS PRESSURE REDUCING & METERING STATION
    13 February 2025

    INDIRECT WBH HEAT TRACING FOR SUMED NATURAL GAS PRESSURE REDUCING & METERING STATION

    • Business Area : RMS

    • Country : Saudi Arabia

    • Completion Date : 2021-2021

    Station Engineering, Design and Field Control

    End User: ARAB PETROLEUM PIPELINES COMPANY (SUMED)

    • Project Management
    • Design & Engineering
    • Purchasing
    • Panel Electromontage
    • Field Assembly
    • Testing and Commissioning
    • Heat trace and wiring