Adatech | 432 MW NATURAL GAS TURBINE POWER PLANT RMS CONTROL SYSTEM CABLING, SITE WORKS

    Continuously
    Perfect Engineering

    (+90) 216 392 14 61

    Clarification Text I've read it. I accept it.
    Adatech | 432 MW NATURAL GAS TURBINE POWER PLANT RMS CONTROL SYSTEM CABLING, SITE WORKS

    27 July 2024

    432 MW NATURAL GAS TURBINE POWER PLANT RMS CONTROL SYSTEM CABLING, SITE WORKS

    • Business Area : Solar Energy

    • Country : Türkmenistan

    • Completion Date : 2019-2020

    Natural Gas Pressure reducing and Metering Station Control System

    End User: TURKMENENERGO STATE POWER CORPORATION

    Time Frame: 2019-2020

    • Project Management

    • Design & Engineering

    • Procurement

    • Panel Electrical Assembly

    • Field Installation

    • Testing and Commissioning

    • Cable Supply and Connections for Instrument and Energy Feeds

    • Cable tray supply and connections

    • Junction box supply and installation

    • Heat trace supply and installation