![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/05/23498.webp)
Strong Partnership
Innovative Solutions
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/02/butia_2Gxige4.jpg)
2020
Infrastructure
Italy
INDIRECT WATERBATH HEATER FOR BUTIA-450 MW ISO COMBINED CYCLE POWER PLANT
Station Engineering, Design and Field Control End user : ANSELDO ENERGIA Time Frame: 2020
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/02/watan6-2.jpg)
2020
Infrastructure
Turkmenistan
432 MW NATURAL GAS TURBINE POWER PLANT RMS CONTROL SYSTEM CABLING, SITE WORKS
Natural Gas Pressure reducing and Metering Station Control System End User: TURKMENENERGO STATE POWER CORPORATION Time Frame: 2019-2020
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/02/Communication_mast_and_assorted_pipes_in_a_National_Grid_compound_-_geograph.org_.uk_-_3112545.jpg)
2021
Infrastructure
Egypt
BORG EL ARAB REDUCING AND METERING STATION
Station Engineering, Design and Field Control End User: EGYPTIAN NATURAL GAS COMPANY (GASCO)
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/02/yer_alti_depolama_KcmkL9K_T3pQTZg.jpg)
2021
Assembly
Egypt
MIDELEC PRESSURE REDUCING AND METERING STATION
Station Engineering, Design and Field Control End User: EGYPTIAN NATURAL GAS COMPANY (GASCO)
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/02/dddddddd-1.png)
2021
Infrastructure
Saudi Arabia
INDIRECT WBH HEAT TRACING FOR SUMED NATURAL GAS PRESSURE REDUCING & METERING STATION
Station Engineering, Design and Field Control End User: ARAB PETROLEUM PIPELINES COMPANY (SUMED)
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/02/gurcistan_oqamjof.jpg)
2021
Infrastructure
Georgia
RUSTAVI PRESSURE REDUCING AND METERING STATION
Station Engineering, Design and Field Control End User: GEORGIAN OIL AND GAS CORPORATION
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/05/Azerbaycan.webp)
2020
Assembly
Azerbaijan
GAS FISCAL METERING PACKAGE
Station Engineering, Design and Field Control End User UMID BABEK OPERATING COMPANY
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/05/Tunus.webp)
2019
Assembly
Tunisia
STEG RMS PHASE I
Station Engineering, Design and Field Control End User: TUNISIAN COMPANY OF ELECTRICITY AND GAS
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/05/tunus-3_b0c0IY9.jpg)
2021
Assembly
Tunisia
STEG RMS PHASE III
Station Engineering, Design and Field Control End User: TURKMENENERGO STATE POWER CORPORATION
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2020/05/tunus-2_ew0ky8Q-1-1.webp)
2024
Assembly
Tunisia
STEG RMS PHASE II
Station Engineering, Design and Field Control End User: TUNISIAN COMPANY OF ELECTRICITY AND GAS
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/05/csm_0264RAG_Portraits_UndergroundSunstorage18_KarinLohbergerPhotography-_d6a96fb6bc_DSiA9Fy.jpg)
2022
Assembly
Turkey
KUZEY MARMARA GAS STORAGE P.III
Natural Gas Fiscal Metering Station Control System
End User: BOTAŞ BORU HATLARI İLE PETROL TAŞIMA A.Ş.![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/05/thumbs_b_c_ade3aa904312c43bb5d94481b046a0ef.jpg)
2022
Assembly
Turkey
BOTAŞ SAROS FSRU PROJECT
Natural Gas Fiscal Metering Station Control System End User: BOTAŞ BORU HATLARI İLE PETROL TAŞIMA A.Ş. Time frame: 2021-2022
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/05/tuz_golu_DPiL54U-scaled.jpg)
2021
Assembly
Turkey
TUZ GOLU GAS STORAGE
Engineering service and technical staff support End user: BOTAŞ BORU HATLARI İLE PETROL TAŞIMA A.Ş. Time frame: 2020-2021
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/05/waterbath_RkNwbZT.jpg)
2021
Assembly
Turkey
WATERBATH HEATER PROJECT
Engineering, Design and Site Supervision of Project End user: AGDAŞ ADAPAZARI GAZ DAĞITIM A.Ş.
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/05/waterbath-tunus.webp)
2020
Infrastructure
Tunisia
WATERBATH HEATER PROJECT PHASE I
Engineering, Design and Site Supervision of Project End User: TUNISIAN COMPANY OF ELECTRICITY AND GAS Time Frame: 2019-2020
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2020/06/waterbath-tunus-3_q1fROH5-1-1.webp)
2020
Infrastructure
Tunisia
WATERBATH HEATER PROJECT PHASE II
Engineering, Design and Site Supervision of Project End user: TUNISIAN COMPANY OF ELECTRICITY AND GAS Time frame: 2019-2020
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/06/gasco-watherbath.webp)
2019
Infrastructure
Egypt
WATERBATH HEATER PROJECT PHASE I
Engineering, Design and Site Supervision of Project End User: EGYPTIAN NATURAL GAS COMPANY (GASCO) Time frame: 2018-2019
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/06/gasco-watherbatch.webp)
2020
Infrastructure
Egypt
WATERBATH HEATER PROJECT PHASE II
Engineering, Design and Site Supervision of Project End User: EGAS EGYPTIAN NATURAL GAS HOLDING COMPANY Time frame: 2019-2020
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/06/Arabistan.webp)
2021
Infrastructure
Saudi Arabia
WATER TRANSPORTATIONS PROJECT
Engineering service and technical staff support End User: MAPA CONSTRUCTION Time Frame: 2021
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/06/rusya.jpg)
2022
Infrastructure
Russia
NIZHNEKAMSK 495 MW KOMBİNE ÇEVRİM ELEKTRİK SANTRALİ
Engineering Service and technical staff support End User: PJSC Nizhnekamskneftekhim; TAIF Group Time Frame: 2022
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/06/tanap_kapak.png)
2022
Infrastructure
Turkey
TANAP CS5-MS2 ESKİŞEHİR KOMPRESOR VE ÖLÇÜM İSTASYONU
Engineering services were provided for 2 Waterbath Heaters located at TANAP CS5-MS2 Eskişehir Compressor and Measurement Station. End User: TANAP Time frame: 2020
![Adatech | References](https://www.adatech.com.tr/wp-content/uploads/2024/06/IZMIR_010.jpg)
2021
Infrastructure
Turkey
İZMİR GAZ ENKA RMS İSTASYONU
Engineering, Design and Site Supervision of the Project End User: İzmir Gaz Time frame: 2021
-
Detay İncele
Italy Completed ProjectsINDIRECT WATERBATH HEATER FOR BUTIA-450 MW ISO COMBINED CYCLE POWER PLANT
-
Detay İncele
Turkmenistan Completed Projects432 MW NATURAL GAS TURBINE POWER PLANT RMS CONTROL SYSTEM CABLING, SITE WORKS
-
Detay İncele
Egypt Completed ProjectsBORG EL ARAB REDUCING AND METERING STATION
-
Detay İncele
Egypt Completed ProjectsMIDELEC PRESSURE REDUCING AND METERING STATION
-
Detay İncele
Saudi Arabia Completed ProjectsINDIRECT WBH HEAT TRACING FOR SUMED NATURAL GAS PRESSURE REDUCING & METERING STATION
-
Detay İncele
Georgia Completed ProjectsRUSTAVI PRESSURE REDUCING AND METERING STATION
-
Detay İncele
Azerbaijan Completed ProjectsGAS FISCAL METERING PACKAGE
-
Detay İncele
Tunisia Completed ProjectsSTEG RMS PHASE I
-
Detay İncele
Tunisia Completed ProjectsSTEG RMS PHASE III
-
Detay İncele
Tunisia Completed ProjectsSTEG RMS PHASE II
-
Detay İncele
Turkey Completed ProjectsKUZEY MARMARA GAS STORAGE P.III
-
Detay İncele
Turkey Completed ProjectsBOTAŞ SAROS FSRU PROJECT
-
Detay İncele
Turkey Completed ProjectsTUZ GOLU GAS STORAGE
-
Detay İncele
Turkey Completed ProjectsWATERBATH HEATER PROJECT
-
Detay İncele
Tunisia Completed ProjectsWATERBATH HEATER PROJECT PHASE I
-
Detay İncele
Tunisia Completed ProjectsWATERBATH HEATER PROJECT PHASE II
-
Detay İncele
Egypt Completed ProjectsWATERBATH HEATER PROJECT PHASE I
-
Detay İncele
Egypt Completed ProjectsWATERBATH HEATER PROJECT PHASE II
-
Detay İncele
Saudi Arabia Completed ProjectsWATER TRANSPORTATIONS PROJECT
-
Detay İncele
Russia Completed ProjectsNIZHNEKAMSK 495 MW KOMBİNE ÇEVRİM ELEKTRİK SANTRALİ
-
Detay İncele
Turkey Completed ProjectsTANAP CS5-MS2 ESKİŞEHİR KOMPRESOR VE ÖLÇÜM İSTASYONU
-
Detay İncele
Turkey Completed ProjectsİZMİR GAZ ENKA RMS İSTASYONU