Adatech | STEG RMS Phase II

    Continuously
    Perfect Engineering
    +90 (216) 514 80 69
    Clarification Text I've read it. I accept it.

    STEG RMS Phase II

    Adatech provided engineering, design, and field supervision services for the STEG Pressure Reducing and Metering Station Phase II Project, supporting the enhancement of automation, safety, and control systems to ensure reliable and efficient energy distribution.

    Business Area RMS
    Country Tunisia
    Completion Date 2019-2020
    STEG RMS Phase II

    Teknik Kapsam

    Engineering

    • PRMS System Design
    • Automation Engineering
    • Safety System Design
    • Control System Engineering

    Field Applications

    • Site Supervision
    • Installation Inspection
    • System Testing
    • Commissioning Support

    Bu Projede Kullanılan Adatech Hizmetleri

    Modicon M221/M241 PLC
    Burner Management System IFD 258
    Communication infrastructure
    UPS (including external battery group)
    Environmental Lighting
    Process instruments
    Cable supply and connections for instrument and energy feeds
    Cable tray supply and connections
    Junction Box supply and assembly
    heat trace supply and assembly

    Benzer bir proje mi planlıyorsunuz?

    İhtiyaçlarınıza özel mühendislik ve uygulama çözümleriyle yanınızdayız.

    Teklif Al