    STEG RMS PHASE II

    • Business Area : RMS

    • Country : Tunisia

    • Completion Date : 2019-2020

    STEG RMS PHASE II

    Adatech provided engineering, design and site supervision services for the STEG Pressure Reducing and Metering Station – Phase II project implemented by Société Tunisienne de l’Electricité et du Gaz (STEG) from 2020-2021. The second phase of the project is a continuation of the systems provided in the first phase and aims to further strengthen the safety and automation infrastructure.

    This project has once again demonstrated Adatech’s expertise in automation and energy infrastructure and has been a critical step in ensuring uninterrupted and reliable operation of the systems. STEG Pressure Reducing and Metering Station – Phase II is equipped with modern control and safety systems, making a significant contribution to energy distribution efficiency in the region.

    End User: Société Tunisienne de l’Electricité et du Gaz (STEG)

    • Project Management
    • Design & Engineering
    • Procurement
    • Panel Electrical Assembly
    • Field Installation
    • Testing and Commissioning
    • Modicon M221/M241 PLC
    • Burner Management System IFD 258
    • Communication infrastructure
    • UPS (including external battery group)
    • Environmental Lighting
    • Process instruments
    • Cable supply and connections for instrument and energy feeds
    • Cable tray supply and connections
    • Junction Box supply and assembly
    • heat trace supply and assembly