    TUNISIA WATERBATH HEATER PROJECT PHASE II

    • Business Area : Gas

    • Country : Tunisia

    • Completion Date : 2020

    Engineering, Design and Site Supervision of Project

    End user: TUNISIAN COMPANY OF ELECTRICITY AND GAS

    Time frame: 2019-2020

    • Project Management
    • Design & Engineering
    • Procurement
    • Panel Electrical Assembly
    • Field Installation
    • Testing and Commissioning
    • Schneider Freelance Distrubuted Control System (Hybrid DCS)
    • SCADA (Redundant)
    • CPU (Redundant)
    • Communication infrastructure
    • Communication with Fire Detection and Extinguishing
    • Total 280 IO
    • Hot Pluggable IO Modules
    • Process Intruments (level, flow, pressure, temperature, etc.)