Adatech | STEG WBH PHASE IV PROJECT

    Continuously
    Perfect Engineering
    (+90) 216 392 14 61
    Clarification Text I've read it. I accept it.
    Adatech | STEG WBH PHASE IV PROJECT

    STEG WBH PHASE IV PROJECT

    • Business Area : Gas

    • Country : Tunisia

    • Completion Date : 2020

    STEG WBH PHASE IV PROJECT

    Adatech provided engineering, design and site supervision services from 2019 to 2020 for the Waterbath Heater – Phase IV project implemented by Société Tunisienne de l’Electricité et du Gaz (STEG). The second phase of this project aimed to expand the infrastructure realized in the first phase and to achieve higher standards of safety and efficiency of the system.

    End user: Société Tunisienne de l’Electricité et du Gaz (STEG)

    • Schneider Freelance Distributed Control System (Hybrid DCS)
    • SCADA (Redundant)
    • CPU (Redundant)
    • Communication Infrastructure (Redundant)
    • Communication with Fire Detection and Extinguishing System
    • Total 280 IO
    • Detachable IO Modules Under Power
    • Process Instruments (level, flow, pressure, temperature, etc.)
    • Project Management
    • Design & Engineering
    • Procurement
    • Panel Electrical Assembly
    • Field Installation
    • Test and Commissioning