Adatech | MIDELEC PRESSURE REDUCING AND METERING STATION

    Continuously
    Perfect Engineering

    (+90) 216 392 14 61

    Clarification Text I've read it. I accept it.
    Adatech | MIDELEC PRESSURE REDUCING AND METERING STATION

    27 July 2024

    MIDELEC PRESSURE REDUCING AND METERING STATION

    • Business Area : RMS

    • Country : Egypt

    • Completion Date : 2020-2021

    Station Engineering, Design and Field Control

    End User: EGYPTIAN NATURAL GAS COMPANY (GASCO)

    • Project Management

    • Design & Engineering

    • Purchasing

    • Panel Electromontage

    • Field Assembly

    • Testing and Commissioning

    • Schneider Modicon M580 - ePac (yedekli - 240 IO)

    • Citect Scada 2018 r2

    • Communication infrastructure (redundant)

    • Fire detection system (exproof-nonexproof)

    • Fire extinguishing system (FM200)

    • Design and supply of living containers

    • Redundant UPS (including external battery pack)

    • Cable supply and connections for instrument and energy feeds

    • Junction box supply and installation

    • Heat trace supply and installation