Midelec PRMS Project
Adatech provided engineering, design, and field supervision services for the Midelec Pressure Reducing and Metering Station Project, delivering reliable and integrated control system solutions to ensure efficient and secure natural gas operations.
Business Area
RMS
Country
Egypt
Completion Date
2020-2021
Teknik Kapsam
Engineering
- PRMS System Design
- Control System Engineering
- Automation Design
- Technical Documentation
Field Applications
- Site Supervision
- Installation Inspection
- System Integration
- Commissioning Support
Bu Projede Kullanılan Adatech Hizmetleri
Schneider Modicon M580 - ePac (Redundant - 240 IO)
›
Client Scada 2018 r2
›
Communication infrastructure (redundant)
›
Fire detection system (Exproof-nonexproof)
›
Fire extinguishing system (FM200)
›
Design and supply of living containers
›
Redundant UPS (including battery group)
›
Cable supply and connections for instrument and energy feeds
›
Cable tray supply and connections
›
Heat trace supply and installation
›
Benzer bir proje mi planlıyorsunuz?
İhtiyaçlarınıza özel mühendislik ve uygulama çözümleriyle yanınızdayız.