    Adatech | STEG RMS PHASE III

    STEG RMS PHASE III

    • İş Alanı : RMS

    • Ülke : Tunus

    • Tamamlanış Tarihi : 2020-2021

    STEG RMS PHASE III

    Adatech provided engineering, design and site supervision services from 2020-2021 for the STEG Pressure Reduction and Metering Station – Phase III project, implemented by Société Tunisienne de l’Electricité et du Gaz (STEG). The third phase of the project aimed to expand and optimize the automation, safety and energy infrastructure provided in the previous phases.

    This project has once again demonstrated Adatech’s expertise in energy infrastructure and automation solutions, enabling STEG to create a more efficient control and monitoring infrastructure, increasing the reliability of energy distribution systems.

    End User: Société Tunisienne de l’Electricité et du Gaz (STEG)

    • Project Management
    • Design & Engineering
    • Procurement
    • Panel Electrical Assembly
    • Field Installation
    • Testing and Commissioning
    • Modicon M221/M241 PLC
    • Burner Management System IFD 258
    • Communication infrastructure
    • UPS (including external battery group)
    • Environmental lighting
    • Process instruments
    • Cable supply and connections for instrument and energy supplies
    • Cable tray supply and connections
    • Junction box supply and installation
    • Heat trace supply and installation