Adatech | STEG RMS Phase I

    Continuously
    Perfect Engineering
    +90 (216) 514 80 69
    Clarification Text I've read it. I accept it.

    STEG RMS Phase I

    Adatech provided engineering, design, and field supervision services for the STEG Pressure Reducing and Metering Station Phase I Project, supporting the modernization of energy transmission infrastructure and the implementation of advanced automation and safety systems.

    Business Area Oil & Gas / Energy
    Country Tunisia
    Completion Date 2018-2019
    STEG RMS Phase I

    Teknik Kapsam

    Engineering

    • PRMS System Design
    • Automation Engineering
    • Safety System Design
    • Electrical Infrastructure Design

    Field Applications

    • Site Supervision
    • Installation Inspection
    • System Integration
    • Commissioning Support

    Bu Projede Kullanılan Adatech Hizmetleri

    Modicon M221/M241 PLC
    Burner Management System IFD 258
    Communication infrastructure
    UPS (including external battery group)
    Environmental lighting
    Process instruments
    Cable supply and connections for instrument and energy supplies
    Cable tray supply and connections
    Junction box supply and installation
    Heat trace supply and installation

    Benzer bir proje mi planlıyorsunuz?

    İhtiyaçlarınıza özel mühendislik ve uygulama çözümleriyle yanınızdayız.

    Teklif Al