STEG RMS PHASE I
-
Business Area : RMS
-
Country : Tunisia
-
Completion Date : 2018-2019
STEG RMS PHASE I
Adatech provided engineering, design and site supervision services for the STEG Pressure Reducing and Metering Station – Phase I project implemented by Société Tunisienne de l’Electricité et du Gaz (STEG) from 2020-2021. This project is critical for modernizing and improving the safety of the energy transmission infrastructure.
This project has been one of the important works that once again proved Adatech’s engineering solutions and technical expertise in the energy sector. Thanks to its advanced control systems and safety infrastructure, the STEG Pressure Reducing and Metering Station makes significant contributions to the security of energy supply in the region.
End User: TUNISIAN COMPANY OF ELECTRICITY AND GAS
-
Project Management
-
Design & Engineering
-
Purchasing
-
Panel Electromontage
-
Field Installation
-
Testing and Commissioning
-
Modicon M221/M241 PLC
-
Burner Management System IFD 258
-
Communication infrastructure
-
UPS (including external battery group)
-
Environmental lighting
-
Process instruments
-
Cable supply and connections for instrument and energy supplies
-
Cable tray supply and connections
-
Junction box supply and installation
-
Heat trace supply and installation