Adatech | WATERBATH HEATER PROJECT PHASE I

    Continuously
    Perfect Engineering

    (+90) 216 392 14 61

    Clarification Text I've read it. I accept it.
    Adatech | WATERBATH HEATER PROJECT PHASE I

    27 July 2024

    WATERBATH HEATER PROJECT PHASE I

    • Business Area : Gas

    • Country : Egypt

    • Completion Date : 2019

    Engineering, Design and Site Supervision of Project

    End User: EGYPTIAN NATURAL GAS COMPANY (GASCO)

    Time frame: 2018-2019

    • Project Management

    • Design & Engineering

    • Procurement

    • Panel Electrical Assembly

    • Field Installation

    • Test and Commissioning

    • Schneider Freelance Distrubuted Control System (Hybrid DCS)

    • SCADA (Redundant)

    • CPU (Redundant)

    • Communication Infrastructure (redundant)

    • Communication with Fire Detection and Extinguishing

    • Total 248 IO

    • Hot Pluggable IO Modules

    • Process Intruments (level, flow, pressure, temperature, etc.)