Adatech | STEG RMS Phase II

    Continuously
    Perfect Engineering
    +90 (216) 514 80 69
    Clarification Text I've read it. I accept it.

    STEG RMS Phase II

    Adatech provided engineering, design, and field supervision services for the STEG Pressure Reducing and Metering Station Phase II Project, supporting the enhancement of automation, safety, and control systems to ensure reliable and efficient energy distribution.

    Business Area RMS
    Country Tunisia
    Completion Date 2019-2020
    STEG RMS Phase II

    Technical Scope

    Engineering

    • PRMS System Design
    • Automation Engineering
    • Safety System Design
    • Control System Engineering

    Field Applications

    • Site Supervision
    • Installation Inspection
    • System Testing
    • Commissioning Support

    Adatech Services Used in This Project

    Modicon M221/M241 PLC ›
    Burner Management System IFD 258 ›
    Communication infrastructure ›
    UPS (including external battery group) ›
    Environmental Lighting ›
    Process instruments ›
    Cable supply and connections for instrument and energy feeds ›
    Cable tray supply and connections ›
    Junction Box supply and assembly ›
    heat trace supply and assembly ›

    Are you planning a similar project?

    We are with you with engineering and application solutions tailored to your needs.

    Get an Offer →