Adatech | Kiyanly 1574 MW Combined Cycle Power Plant Project

    Continuously
    Perfect Engineering
    +90 (216) 514 80 69
    Clarification Text I've read it. I accept it.

    Kiyanly 1574 MW Combined Cycle Power Plant Project

    Adatech delivered the electrical and automation systems for four Diverter Damper units, including MCC and PLC panel design, software development, and commissioning activities for the KIYANLY 1574 MW Combined Cycle Power Plant Project.

    Business Area Power Plant
    Country Turkmenistan
    Completion Date 2024-Ongoing
    Kiyanly 1574 MW Combined Cycle Power Plant Project

    Technical Scope

    Engineering

    • MCC Panel Design
    • PLC Panel Design
    • PLC Software Development
    • Control System Engineering

    Field Applications

    • Panel Manufacturing
    • System Installation
    • PLC Commissioning
    • Functional Testing

    Adatech Services Used in This Project

    4 Unit Diverter Damper System
    MCC Panels and PLC Panels Design and Production
    PLC Software