Adatech | Edirne Havsa – Keşan – Meriç CNG Stations

    Continuously
    Perfect Engineering
    +90 (216) 514 80 69
    Clarification Text I've read it. I accept it.

    Edirne Havsa – Keşan – Meriç CNG Stations

    Adatech provided project management, engineering, design, procurement, training, installation, testing, and commissioning services for the Edirne Havsa–Keşan–Meriç CNG Stations Project, supporting the expansion of regional natural gas infrastructure.

    Business Area Oil & Gas
    Country Turkiye
    Completion Date 2018-2019
    Edirne Havsa – Keşan – Meriç CNG Stations

    Technical Scope

    Engineering

    • Waterbath Heater Engineering
    • Process System Design
    • Automation Design
    • Safety System Engineering

    Field Applications

    • Site Supervision
    • Equipment Installation
    • System Testing
    • Commissioning Support

    Adatech Services Used in This Project

    Supply and installation of underground grounding system
    Supply and installation of lightning rod system
    Lighting supply and installation, (exproof area)
    Supply and assembly of armored cables for instrument and energy supplies
    Heavy-duty cable tray supply and installation
    Junction Box supply and assembly

    Are you planning a similar project?

    We are with you with engineering and application solutions tailored to your needs.

    Get an Offer