Adatech | STEG RMS Phase III

    Continuously
    Perfect Engineering
    +90 (216) 514 80 69
    Clarification Text I've read it. I accept it.

    STEG RMS Phase III

    Adatech provided engineering, design, and field supervision services for the STEG Pressure Reducing and Metering Station Phase III Project, supporting the expansion and optimization of automation, safety, and energy infrastructure systems.

    Business Area Oil & Gas / Energy
    Country Tunus
    Completion Date 2020-2021
    STEG RMS Phase III

    Technical Scope

    Engineering

    • PRMS System Design
    • Automation Engineering
    • Safety System Design
    • Electrical Infrastructure Design

    Field Applications

    • Site Supervision
    • Installation Inspection
    • System Integration
    • Commissioning Support

    Adatech Services Used in This Project

    Modicon M221/M241 PLC ›
    Burner Management System IFD 258 ›
    Communication infrastructure ›
    UPS (including external battery group) ›
    Environmental lighting ›
    Process instruments ›
    Cable supply and connections for instrument and energy supplies ›
    Cable tray supply and connections ›
    Junction box supply and installation ›
    Heat trace supply and installation ›

    Are you planning a similar project?

    We are with you with engineering and application solutions tailored to your needs.

    Get an Offer →