IGDIR – NAXCHIVAN GAS PIPELINE PROJECT
-
Business Area : RMS
-
Country : Azerbaijan
-
Completion Date: 2024-Ongoing
IGDIR – NAHCIVAN GAS PIPELINE PROJECT
The Igdir – Nakhchivan Gas Pipeline Project is an important infrastructure project realized to increase the security of energy supply and strengthen strategic cooperation between Turkey and Azerbaijan. Within the scope of the project, all engineering, procurement, field implementation, testing and commissioning works for automation, energy, security and communication systems at the RMS station and related sites were undertaken by Adatech.
Adatech has assumed responsibility for a wide technical scope ranging from automation system and software, SCADA infrastructure, transformer, generator and UPS systems to field electrical and instrumentation applications in the RMS area. In addition, the project design, material procurement, field installation and commissioning processes of all critical systems, including CCTV, fire detection and extinguishing systems, gas detection, grounding and lightning protection systems, are also successfully managed.
In order to guarantee the smooth operation of the system, quality documentation processes are also prepared with Adatech expertise and compliance with international standards is ensured at every stage of the project.
End User : State Oil Company of Azerbaijan Republic (SOCAR)
-
Project Management
-
Material Supply
-
Design and Engineering
-
Field Installation
-
Testing and Commissioning
-
Automation system, software and equipment
-
Scada system
-
Energy supply systems (Transformer, Generator and UPS)
-
The entire exterior lighting system
-
Electrical installations in the buildings
-
CCTV system
-
Fire detection and extinguishing systems
-
Gas detection system
-
Grounding and lightning protection system
-
Field electrical and instrument system,
-
Analyzer container system
-
Preparation of quality documents