KIYANLY 1574 MW COMBINED CYCLE POWER PLANT PROJECT
-
Business Area : Power Plant
-
Country : Turkmenistan
-
Completion Date :
Employer : TURKMENENERGO STATE POWER CORPORATION OF THE MINISTRY OF ENERGY OF TURKMENISTAN
Contractor: ÇALIK ENERJİ SAN. VE TİC. A.Ş.
Subcontractor : Rota Engineering and Energy Systems Industry Trade Inc.
-
Project Management
-
Design & Engineering
-
Procurement
-
Panel Electrical Assembly
-
Field Installation
-
Testing and Commissioning
-
4 Unit Diverter Damper System
-
MCC Panels and PLC Panels Design and Production
-
PLC Software