Adatech | KIYANLY 1574 MW COMBINED CYCLE POWER PLANT PROJECT

    Continuously
    Perfect Engineering
    (+90) 216 392 14 61
    Clarification Text I've read it. I accept it.
    Adatech | KIYANLY 1574 MW COMBINED CYCLE POWER PLANT PROJECT
    13 February 2025

    KIYANLY 1574 MW COMBINED CYCLE POWER PLANT PROJECT

    • Business Area : Power Plant

    • Country : Turkmenistan

    • Completion Date :

    Employer : TURKMENENERGO STATE POWER CORPORATION OF THE MINISTRY OF ENERGY OF TURKMENISTAN

    Contractor: ÇALIK ENERJİ SAN. VE TİC. A.Ş.

    Subcontractor : Rota Engineering and Energy Systems Industry Trade Inc.

    • Project Management
    • Design & Engineering
    • Procurement
    • Panel Electrical Assembly
    • Field Installation
    • Testing and Commissioning
    • 4 Unit Diverter Damper System
    • MCC Panels and PLC Panels Design and Production
    • PLC Software