    Adatech | TANAP MS2 / CS5 STATIONS MAINTENANCE WORK

    TANAP MS2 / CS5 STATIONS MAINTENANCE WORK

    • Business Area : Gas

    • Country : Türkiye

    • Completion Date : 2021-2024

    TANAP MS2 / CS5 STATIONS MAINTENANCE WORK

    This project, carried out within the scope of a long-term maintenance agreement, plays a crucial role in ensuring the continuous and reliable operation of the fuel gas heating system, which is essential for the overall performance and safety of the station.

    Throughout the project, Adatech focused on delivering high-quality engineering solutions, including system inspections, performance evaluations, and preventive maintenance activities to enhance the longevity and efficiency of the heating units. The maintenance work covered both the CS5 Compressor Station in Seyitgazi, Eskişehir, and the CS5 Offtake Compressor Station, ensuring that the Waterbath Heaters operated at optimal capacity under all operational conditions.

    With extensive expertise in energy infrastructure and industrial automation, Adatech played a key role in maintaining the integrity and efficiency of TANAP’s critical gas transmission system. By implementing advanced maintenance strategies and applying its technical know-how, Adatech contributed to the long-term operational stability and safety of these vital components, reinforcing its commitment to delivering high-standard engineering services.

    End User : TANAP DOGAL GAZ İLETİM A.S.

     

     

    • Engineering services
    • Engineering services were provided for 2 Waterbath Heaters located at TANAP CS5-MS2 Eskişehir Compressor and Measurement Station.